Several retrofit measures were installed including:
- Replacement of existing cladding with thermally efficient external wall insulation with a render finish.
- Replacement double-glazed windows, with a premium placed on the fitting process to combat high winds and drafts which had previously been a concern for occupants.
- Replacement insulated roof with enhanced safety system and feature lighting.
The retrofit works carried out to this building improve the energy performance and ensure the building’s longevity. The project won the INCA High-Rise Refurbishment Award in 2022 highlighting the success of the project.